CCOG for ELT 152 archive revision 201403
You are viewing an old version of the CCOG. View current version »
- Effective Term:
- Summer 2014 through Summer 2023
- Course Number:
- ELT 152
- Course Title:
- Fiber Optics: Inside/Outside Plant
- Credit Hours:
- 4
- Lecture Hours:
- 20
- Lecture/Lab Hours:
- 40
- Lab Hours:
- 0
Course Description
Application for Ready Access; includes the use of special splicing techniques, enclosures, test sets and fault locating equipment. Placing, splicing, termination and testing of fiber optic cables in campus applications is included. This class can be used towards Continuing Education Units for Oregon State electrical licensing purposes.
Intended Outcomes for the course
- Describe the operation of related test equipment.
- Demonstrate connectorization techniques.
- Locate and repair breaks in Fiber Optics cabling.
- Properly set-up and use specialized test equipment.
Course Activities and Design
In-class activities are made up of lecture, demonstrations, hands-on activities and discussions. See instructor syllabus for details.
Outcome Assessment Strategies
Procedures will be discussed at the first class session and the instructor's grading policy will be referenced on the class syllabus.
Course Content (Themes, Concepts, Issues and Skills)
- Explain methods and design of campus installations.
- Describe the operation of related test equipment.
- Identify applications of fiber optics in Inside Plant applications.
- Explain the difference between Inside and Outside applications.
- Plan a typical Inside cable installation.