CCOG for ELT 251 archive revision 201403
You are viewing an old version of the CCOG. View current version »
- Effective Term:
- Summer 2014 through Summer 2023
- Course Number:
- ELT 251
- Course Title:
- AMP ACT II
- Credit Hours:
- 1
- Lecture Hours:
- 5
- Lecture/Lab Hours:
- 10
- Lab Hours:
- 0
Course Description
Students will obtain the experience necessary to certify and document twisted pair and optical fiber cable plants based on established industry standards, which include ANSI/TIA/EIA- 568A, TSB-67, ANSI/EIA/TIA-526-14A and ANSI/TIA/EIA-526- 7. Each student will also obtain experience troubleshooting common problems with installed LAN cable plants. This course is approximately 75% hands-on training. An extensive documentation package is provided. Successful completion of the course examination will certify you as an AMP Registered Certifier and Troubleshooter. Audit available.
Intended Outcomes for the course
- Determine the requirements for the scope of the work that will be performed
- Properly test fiber and copper cables within the structured cabling world
- Demonstrate troubleshooting skills and resolve incurred problems
- Identify incorrectly terminated jacks and patch panels and demonstrate proper method
- Articulate and practice the benefits of standards compliance
- Utilize and demonstrate the required testing for the scope of the project
Course Activities and Design
In-class activities are made up of lecture, demonstrations, hands-on activities and discussions.
Outcome Assessment Strategies
Assessment will be based on class participation, successful connectorization with minimal signal loss, and exam scores.
Course Content (Themes, Concepts, Issues and Skills)
- Determine the requirements for the scope of the work that will be performed
- Properly test fiber and copper cables within the structured cabling world
- Demonstrate troubleshooting skills and resolve incurred problems
- Identify incorrectly terminated jacks and patch panels and demonstrate proper method
- Articulate and practice the benefits of standards compliance
- Utilize and demonstrate the required testing for the scope of the project