All-user restroom locations at PCC
See?PCC’s Accessible Building Features Map?for a floor plan of these locations.
Cascade
- Cascade Hall
- 1 on second floor
- Jackson Hall
- 1 across from room 217
- Library
- 1 on first floor, next to entrance and other bathrooms
- 1 on second floor, next to room 203
- Moriarty Arts & Humanities Building
- 1 multi-stall on second floor
- Paragon
- 2 single-occupant restrooms on main floor
- Physical Education Building
- 2 single-occupant locker rooms with shower on first floor
- Student Services Building
- 2 on third floor, NW corner of building
- Student Union
- 1 single-occupant on first floor
- 1 multi-stall restroom on the 2nd floor across from the elevator
- 2 single-occupant on third floor
- Technology Education Building (TEB)
- 1 multi-stall on first floor
- Terrell Hall
- 1 multi-stall on second floor
Rock Creek
- Building 1 (Staff Access Only – Facilities – Coming Soon!)
- Building 2
- 1 multi-stall on second floor
- Building 3
- 2 on first floor
- 1 on second floor
- Building 4
- 1 multi-stall on main floor
- 1 single-occupant on main floor
- Building 5
- 1 on first floor
- 1 on second floor
- 2 single-occupant locker rooms with a shower on first floor
- Building 7
- 1 single-stall between rooms 116 and 117
- 1 multi-stall restroom near 118
- Building 9
- 1 single-stall on first floor across from room 116 (in counseling department)
1 multi-stall on second floor in Library? CLOSED DUE TO CONSTRUCTION: Tentative reopening Spring 2025
- Kennel
- 1 on first floor
- West Campus (near barn)
- 1 multi-stall restroom near cafe
- New Barn Coming Soon with 2 single-occupant restrooms!
Southeast
- Administration Hall:
- 2 on first floor, next to room 109
- 1 on second floor, across from room 202
- 1 on third floor, across from room 304
- 1 on fourth floor, near room 403
- Community Hall
- 1 on first floor
- Library
- 1 multi-stall on first floor
- 2 on third floor, east end of building, next to room 312
- Student Commons
- 1 on second floor, north end of building, around corner from room 213
- 1 on third floor, north end of building, around corner from room 313
- Mt. Scott Hall
- 1 multi-stall restroom on second floor
- Mt. Tabor Hall
- 1 multi-stall restroom near cafe
Sylvania
- AM building (Future Site – 2030s)
- 1 planned as part of the PCC Bond, not yet built
- CC building
- 1 single-occupant on second floor, south of cafeteria near stairs
- 1 on first floor, below the QRC, multi-stall
- CT building
- 4 single-occupant on second floor, room 215. Go down the hall, make a right. Down that hall on your right hand side are 4 restrooms.
- College Services Building
- 2 single-occupant on first floor
- 1 single-occupant on second floor
- HT building (HT West under construction – More Coming in 2025!)
- 2 single-occupant locker rooms with shower on pool deck accessible through room 103
- 2 multi-stall on second floor
- 1 all-user shower room on second floor
- 1 multi-stall on third floor
- Library
- 1 multi-stall on first floor
- ST building
- 1 on second floor
- TCB building
- 1 on second floor, northwest corner next to gendered bathrooms
CLIMB Building
- 1 multi-stall on 2nd floor
Downtown Center
- 1 on 1st floor, next to room 116
- 2 in basement, next to room B010 (shower)
- 1 on 4th floor
Newberg Center
- 1 on west end of building next to vending machines
Swan Island
- 1 multi-stall on the main floor
Opportunity Center at 42nd Ave
- 1 single-occupant on first floor
- single-occupant available on second floor (limited–card access only)
Willow Creek Opportunity Center
- 1 on third floor next to elevator